Investor Update
Artalia Bayside · Bayside, WI
Contact investor@matterdevelops.com if you need access.
Investor Update · Under Construction

Artalia Bayside
Senior Living

711 Lotti Avenue  ·  Bayside, WI 53217  ·  Quarter II 2026

153 Units
Total Community Size
109 · 24 · 20
IL · AL · MC  Units
Dec 2027
Projected Completion
Artalia Bayside — Reception Rendering
Scroll to explore
Asset Overview

A full senior living continuum of care
on Milwaukee's prestigious North Shore

Project
Artalia Bayside Senior LivingNew Construction — 5-story IL/AL building + 1-story MC household
Location
711 Lotti Avenue, Bayside, WI 53217 ↗ OneNorth Development — NEC I-43 & Brown Deer Road
Total Units
153 UnitsIL (109) · AL (24) · MC (20) · Underground parking garage
Site
2.29 AcresWithin the OneNorth mixed-use redevelopment
Developer & Operator
Matter DevelopmentDeveloper — matterdevelops.com ↗Koru Health (KMJV Operation)Operator — 1,142 units managed across WI & MN
Projected Completion
December 2027General Contractor: Moore Construction Services
Featured Photos

Construction Progress Feature Photos

📷
Tower Crane Setting Panels
Replace with photo from 6/19 report
📷
Walls Laid Out
Replace with photo from 6/19 report
📷
Pouring Topping
Replace with photo from 6/19 report
Investment Highlights

A new senior living destination
in a visible, high barrier-to-entry market

Development Budget
$61.3M
Spent to Date$12,340,869
20.1% of $61,285,326 total budget
Class A Equity
$20.4M
$18.6M from Class A investors (91.5%)
Sponsor contributing $1.7M Class A equity (8.5%)
* If your capital has not yet been called, please watch for ongoing capital calls as funds are required to pay the Company’s obligations.
Investment Returns
12.2%
Average annual cash on cash return — 19.76% IRR — 2.33x equity multiple over 7-year hold
Preferred Return
4% 8%
4.0% annually during construction, stepping to 8.0% at certificate of occupancy
Construction Financing
$42M
$21M locked at 6.30% · $8M locked at 6.20% · Balance floating at SOFR + 275 bps — interest-only for 36 months, then 5-year mini perm
Market Supply Gap
20+ Yrs
No new senior continuum of care community built on Milwaukee's North Shore in over 20 years
The Opportunity

Milwaukee's North Shore — encompassing Bayside, Fox Point, Whitefish Bay, and Mequon — represents one of the most affluent and age-favorable submarkets in the region. With a median household income of $110,567 (3-mile radius), 11.82% of the population aged 75+, and no new full continuum development in over two decades, Artalia Bayside enters a deeply supply-constrained market.

The Community

Artalia Bayside will offer independent living, assisted living, and memory care within a newly constructed five-story building with underground parking and a central landscaped courtyard. Premium amenities include a two-story social and dining room, tearoom, golf simulator, health and fitness center, rooftop patio, and a secure outdoor courtyard for memory care. Operated by Koru Health (KMJV Operation).

Proforma Stabilization

Year 1 projects 43.3% occupancy during lease-up with NOI of $569K. By Year 2, stabilized occupancy of 90.9% drives NOI to $4.55M with a 50% operating margin. Year 3+ targets 94.5% occupancy and NOI of $5.7M — a 54.6% operating margin — supporting a projected sale at a conservative 7.5% cap rate in Year 7.

Rate Positioning

Artalia Bayside is positioned as a market leading senior living development in the North Shore market. IL rates of $2,738–$8,929/month, AL at $5,667–$9,727/month, and MC at $8,268–$10,068/month are supported by comparable communities in the trade area — many of which are 15–20+ years old and due for replacement-quality competition.

Marketing Update

Pre-leasing & market positioning in progress

Pre-Leasing Status
80+ Leads
80+ interest list leads already accumulated across IL, AL, and MC — driven in part by the high-profile, visible OneNorth location.
Community Website
artaliabayside.com
Visit artaliabayside.com ↗ — the community's leasing and information website for prospective residents and their families.
Target Market
North Shore
Bayside, Fox Point, Whitefish Bay, Mequon — median adult child HH income of $144,238 within 3 miles.
Brand & Identity
Active

The name Artalia suggests a curated collection of art. Over time, our seniors have gathered the treasures that matter most — memories, friends, stories, even pieces of furniture or artwork — and that curation defines who we are. The Artalia brand honors those collections and invites every resident to bring the richness of their life experiences. Marketing materials, leasing website, and collateral are in development.

Community Outreach
Active

Artalia has already begun receiving requests for community partnerships — including from the new North Shore Library — and has participated in local event sponsorships. Outreach to area physicians, hospital discharge planners, senior advisors, and referral networks is being established in advance of opening. The North Shore market is highly relationship-driven, and early pipeline development is a clear priority.

Competitive Position
Strong

Artalia Bayside will be the first new full continuum of care community on Milwaukee's North Shore in over 20 years. Ten comparable communities within 6 miles average 15+ years of age. No direct new supply is in the pipeline. Premium new construction at a prestigious Bayside address creates a compelling product in a market ready for a new generation of senior living.

Leasing Pipeline
80+ Leads

More than 80 interest list leads have already been accumulated across IL, AL, and MC — a meaningful early result driven in part by the high-profile, visible OneNorth location adjacent to The Symphony luxury apartments and the new North Shore Library. An AI lead engagement agent has been implemented to provide interim support to the marketing team while under construction, ensuring no lead goes unattended during the pre-opening phase.

Construction Update

Week ending June 19, 2026
& recent progress

Project Milestone Progress
As of June 2026  ·  Turnover: December 20, 2027
Now
Site & Excav­ation
Sep–Oct '25
✓ Complete
Parking Garage
Oct '25–Feb '26
✓ Complete
1st Floor Structure
Feb–Jun '26
✓ Complete
2nd–5th Floor Framing
Apr–Nov '26
▶ In Progress
Building Enclosure
Oct '26–Jan '27
Upcoming
Interior Finishes
Nov '26–Dec '27
Upcoming
Turnover & CO
Dec 20, 2027
◆ Target
Progress Timeline — Quarter II 2026
June 2026
2nd Floor Structure & Crane Erection
Both east and west tower cranes erected. 2nd floor precast set, grouted, and topping poured. Masonry scaffolding erected for 2nd floor precast. Wall panels laid out and prepped. Intus windows secured and onsite. Underground electrical and plumbing continuing in lower level parking garage throughout the month.
May 2026
1st Floor Complete & Memory Care Foundations
1st floor masonry completed. West courtyard masonry finished. Memory care precast footings and foundations poured and backfilled. MC block walls rising. West road installation underway. Underground MEP continuing in lower level parking garage. 2nd floor precast plank delivery and setting commenced end of month.
April 2026
Foundation & 1st Floor Topping
East and south masonry walls rising. First floor topping poured. Precast topping completed. South side backfilled. East CMU walls above grade. Lower level pumped and MEP underground initiated. Memory care footings dug and precast piers poured.
Most Recent Update
Week Ending 6/19/2026
  • Underground Electrical and Plumbing in Lower Level Parking Garage
  • Pour 2nd Floor Topping
  • Masonry Scaffolding for 2nd Floor Precast
  • West Crane Erection
  • Pump Out Water from Courtyard and Lower Level
  • Layout and Prep for Wall Panels
Look Ahead Schedule
  • 2nd Floor Wall Panels
  • Underground Electrical and Plumbing
Questions? Reach out directly.
Matter Development
investor@matterdevelops.com
2675 N Mayfair Road, Suite 200  ·  Wauwatosa, WI 53226
Managing Director & Founder, CEO
Aaron R. Matter
414-409-1295
aaron@matterdevelops.com
Partner
Wayne Rappold
wayne@matterdevelops.com